Learn about Mu2e-II: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
|- | |- | ||
| I_average in pulse || 2 || mA | | I_average in pulse || 2 || mA | ||
|- | |||
| Pulse length || 550 || micro s | |||
|- | |||
| Pulse rep rate || 20 || Hz | |||
|- | |||
| Bunch pattern || programmable || | |||
|- | |||
| RF frequency || 162.5 || MHz | |||
|- | |||
| || 325 || MHz | |||
|- | |||
| || 650 || MHz | |||
|- | |||
!colspan="3" |Mu2e-II parameters | |||
|- | |||
| Run time/yr || 2e7 || s | |||
|- | |||
| Duration of run || 3 || yr | |||
|- | |||
| Total run time || 6e7 || s | |||
|- | |||
| Total linac reps || 1.2e9 || | |||
|- | |||
| Extinction || 1e-11 || | |||
|- | |||
| Beam power || 100 || kW | |||
|- | |||
!colspan="3" |Optimizable parameters for stopping target material | |||
|-style="color: green;" | |||
!colspan="3" |Aluminum stopping target | |||
|- | |||
| Number of bunches || 16 || (at 162.5 MHz) | |||
|- | |||
| Spill width || 100 || ns | |||
|- | |||
| Spill period || 1693 || ns | |||
|- | |||
| Spills/linac rep || 27770 || approximate, at 20 Hz linac repetition rate | |||
|- | |||
| Protons/spill || 1.4e9 || | |||
|- | |||
| POT || 4.67e22 || | |||
|- | |||
| Stopped mu/p || 1.9e-4 || rough estimate, TBC, assumes stopped mu/kW same at 800 and 8000 MeV among possibly other things | |||
|- | |||
| SES || <3e-18 || | |||
|- | |||
| E(conversion e-) || 104.97 || MeV | |||
|- | |||
| tau(muon) || 864 || ns | |||
|-style="color: green;" | |||
!colspan="3" |Lead stopping target | |||
|- | |||
| E(conversion e-) || 94.9 || MeV | |||
|} | |} |
Revision as of 22:56, 12 August 2020
Parameter | Nominal value | Units |
---|---|---|
PIP-II parameters | ||
Beam energy (kinetic) | 800 | MeV |
1.28e-10 | J | |
Particles/pulse | 6.7e12 | |
I_average in pulse | 2 | mA |
Pulse length | 550 | micro s |
Pulse rep rate | 20 | Hz |
Bunch pattern | programmable | |
RF frequency | 162.5 | MHz |
325 | MHz | |
650 | MHz | |
Mu2e-II parameters | ||
Run time/yr | 2e7 | s |
Duration of run | 3 | yr |
Total run time | 6e7 | s |
Total linac reps | 1.2e9 | |
Extinction | 1e-11 | |
Beam power | 100 | kW |
Optimizable parameters for stopping target material | ||
Aluminum stopping target | ||
Number of bunches | 16 | (at 162.5 MHz) |
Spill width | 100 | ns |
Spill period | 1693 | ns |
Spills/linac rep | 27770 | approximate, at 20 Hz linac repetition rate |
Protons/spill | 1.4e9 | |
POT | 4.67e22 | |
Stopped mu/p | 1.9e-4 | rough estimate, TBC, assumes stopped mu/kW same at 800 and 8000 MeV among possibly other things |
SES | <3e-18 | |
E(conversion e-) | 104.97 | MeV |
tau(muon) | 864 | ns |
Lead stopping target | ||
E(conversion e-) | 94.9 | MeV |