Learn about Mu2e-II: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
!Parameter | !Parameter | ||
!Nominal value | !Nominal value | ||
!Units | !Units, Comments | ||
|- | |- | ||
!colspan="3" |PIP-II parameters | !colspan="3" |PIP-II parameters | ||
Line 14: | Line 14: | ||
| Particles/pulse || 6.7<math>\small{\times 10^{12}}</math> || | | Particles/pulse || 6.7<math>\small{\times 10^{12}}</math> || | ||
|- | |- | ||
| I_average in pulse || 2 || mA | | I_average in pulse || 2 || mA (5 mA peak) | ||
|- | |- | ||
| Pulse length || 550 || <math>\small\mu</math>s | | Pulse length || 550 || <math>\small\mu</math>s | ||
Line 21: | Line 21: | ||
|- | |- | ||
| Bunch pattern || programmable || | | Bunch pattern || programmable || | ||
|- | |||
| Peak bunch size || 0.8<math>\small{\times 10^8}</math> || (5 mA) | |||
|- | |||
| Bunch length || 4 || ps | |||
|- | |- | ||
| RF frequency || 162.5 || MHz | | RF frequency || 162.5 || MHz | ||
Line 29: | Line 33: | ||
|- | |- | ||
!colspan="3" |Mu2e-II parameters | !colspan="3" |Mu2e-II parameters | ||
|- | |||
| Bunch frequency || 81.25 || MHz (assumes 1/2 of 162.5 available) | |||
|- | |- | ||
| Run time/yr || 2<math>\small{\times 10^{7}}</math> || s | | Run time/yr || 2<math>\small{\times 10^{7}}</math> || s | ||
Line 42: | Line 48: | ||
| Beam power || 100 || kW | | Beam power || 100 || kW | ||
|- | |- | ||
| Number of bunches || | | Number of bunches || 8 || (at 81.25 MHz) | ||
|- | |- | ||
| Spill width || 100 || ns | | Spill width || 100 || ns |
Revision as of 21:06, 28 August 2020
Parameter | Nominal value | Units, Comments |
---|---|---|
PIP-II parameters | ||
Beam energy (kinetic) | 800 | MeV |
1.28[math]\displaystyle{ \small{\times 10^{-10}} }[/math] | J | |
Particles/pulse | 6.7[math]\displaystyle{ \small{\times 10^{12}} }[/math] | |
I_average in pulse | 2 | mA (5 mA peak) |
Pulse length | 550 | [math]\displaystyle{ \small\mu }[/math]s |
Pulse rep rate | 20 | Hz |
Bunch pattern | programmable | |
Peak bunch size | 0.8[math]\displaystyle{ \small{\times 10^8} }[/math] | (5 mA) |
Bunch length | 4 | ps |
RF frequency | 162.5 | MHz |
325 | MHz | |
650 | MHz | |
Mu2e-II parameters | ||
Bunch frequency | 81.25 | MHz (assumes 1/2 of 162.5 available) |
Run time/yr | 2[math]\displaystyle{ \small{\times 10^{7}} }[/math] | s |
Duration of run | 3 | yr |
Total run time | 6e7 | s |
Total linac reps | 1.2[math]\displaystyle{ \small{\times 10^{9}} }[/math] | |
Extinction | 1[math]\displaystyle{ \small{\times 10^{-11}} }[/math] | |
Beam power | 100 | kW |
Number of bunches | 8 | (at 81.25 MHz) |
Spill width | 100 | ns |
Production target parameters | ||
Material | ||
Power deposition | kW | |
Optimizable parameters for stopping target material | ||
Aluminum stopping target | ||
Spill period | 1693 | ns |
Spills/linac rep | 27770 | approximate, at 20 Hz linac repetition rate |
Protons/spill | 1.4[math]\displaystyle{ \small{\times 10^{9}} }[/math] | |
POT | 4.67[math]\displaystyle{ \small{\times 10^{22}} }[/math] | |
Stopped mu/p | 1.9[math]\displaystyle{ \small{\times 10^{-4}} }[/math] | rough estimate, TBC, assumes stopped mu/kW same at 800 and 8000 MeV among possibly other things |
SES | <3[math]\displaystyle{ \small{\times 10^{-18}} }[/math] | |
E(conversion e-) | 104.97 | MeV |
tau(muon) | 864 | ns |
Lead stopping target | ||
E(conversion e-) | 94.9 | MeV |
Tracker | ||
Resolution at 100 MeV | ||
Calorimeter | ||
Material | ||
Energy resolution | 10% | % |
Time resolution | < 500 | ps |
Radiation dose | 10 | kGy |
[math]\displaystyle{ \small 1\times 10^{13} }[/math] | n/cm[math]\displaystyle{ \small{^2} }[/math]/s | |
Cosmic Ray Veto | ||
Trigger/DAQ | ||
Event size | 1 | MB |
Tape storage | 14 | PB/yr |