Learn about Mu2e-II: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 34: | Line 34: | ||
| Operation || 40 || wk/yr | | Operation || 40 || wk/yr | ||
|- | |- | ||
| Up time || 90 || % | | Up time in operation || 90 || % | ||
|- | |- | ||
!colspan="3" |Mu2e-II parameters | !colspan="3" |Mu2e-II parameters |
Revision as of 21:39, 13 September 2021
Parameter | Nominal value | Units, Comments |
---|---|---|
PIP-II parameters | ||
Beam energy (kinetic) | 800 | MeV |
1.28[math]\displaystyle{ \small{\times 10^{-10}} }[/math] | J | |
Particles/pulse | 6.7[math]\displaystyle{ \small{\times 10^{12}} }[/math] | |
I_average in pulse | 2 | mA (5 mA peak) |
Pulse length | 550 | [math]\displaystyle{ \small\mu }[/math]s |
Pulse rep rate | 20 | Hz |
Bunch pattern | programmable | |
Peak bunch size | 2[math]\displaystyle{ \small{\times 10^8} }[/math] | (5 mA) |
Bunch length | 4 | ps |
RF frequency | 162.5 | MHz |
325 | MHz | |
650 | MHz | |
Operation | 40 | wk/yr |
Up time in operation | 90 | % |
Mu2e-II parameters | ||
Bunch frequency | 81.25 | MHz (assumes 1/2 of 162.5 available) |
Calibration, background, special runs | 30 | % |
CE data | 70 | % |
Mu2e-II efficiency | 100 | % |
CE run time/yr | 1.5[math]\displaystyle{ \small{\times 10^{7}} }[/math] | s |
Duration of run | 4 | yr |
Total run time | 6[math]\displaystyle{ \small{\times 10^7} }[/math] | s |
Total linac reps | 1.2[math]\displaystyle{ \small{\times 10^{9}} }[/math] | |
Extinction | 1[math]\displaystyle{ \small{\times 10^{-11}} }[/math] | [1[math]\displaystyle{ \small{\times 10^{-13}} }[/math] for 100x safety margin] |
Beam power | 120 | kW (100 kW nominal) |
Number of bunches/spill | 8 | (at 81.25 MHz) |
Spill width | 100 | ns |
Production target parameters | ||
Material | ||
Power deposition | kW | |
Optimizable parameters for stopping target material | ||
Aluminum stopping target | ||
Spill period | 1693 | ns |
Spills/linac rep | 27770 | approximate, at 20 Hz linac repetition rate |
Protons/spill | 1.6[math]\displaystyle{ \small{\times 10^{9}} }[/math] | (5 mA) |
POT | 5[math]\displaystyle{ \small{\times 10^{22}} }[/math] | |
Stopped mu/p | 1.9[math]\displaystyle{ \small{\times 10^{-4}} }[/math] | rough estimate, TBC, assumes stopped mu/kW same at 800 and 8000 MeV among possibly other things |
SES | <3[math]\displaystyle{ \small{\times 10^{-18}} }[/math] | |
E(conversion e-) | 104.97 | MeV |
tau(muon) | 864 | ns |
Lead stopping target | ||
E(conversion e-) | 94.9 | MeV |
Tracker | ||
Resolution at 100 MeV | ||
Calorimeter | ||
Material | ||
Energy resolution | 5% | % (FWHM/2.36) |
Time resolution | < 500 | ps |
Position resolution | 10 | mm |
Radiation dose | 10 | kGy/yr |
[math]\displaystyle{ \small 1\times 10^{13} }[/math] | n/cm[math]\displaystyle{ \small{^2} }[/math] (total 1 MeV equivalent) | |
Cosmic Ray Veto | ||
Trigger/DAQ | ||
Event size | 1 | MB |
Tape storage | 14 | PB/yr |