Learn about Mu2e-II
Jump to navigation
Jump to search
Parameter | Nominal value | Units |
---|---|---|
PIP-II parameters | ||
Beam energy (kinetic) | 800 | MeV |
1.28[math]\displaystyle{ \small{\times 10^{-10}} }[/math] | J | |
Particles/pulse | 6.7[math]\displaystyle{ \small{\times 10^{12}} }[/math] | |
I_average in pulse | 2 | mA |
Pulse length | 550 | [math]\displaystyle{ \small\mu }[/math]s |
Pulse rep rate | 20 | Hz |
Bunch pattern | programmable | |
RF frequency | 162.5 | MHz |
325 | MHz | |
650 | MHz | |
Mu2e-II parameters | ||
Run time/yr | 2[math]\displaystyle{ \small{\times 10^{7}} }[/math] | s |
Duration of run | 3 | yr |
Total run time | 6e7 | s |
Total linac reps | 1.2[math]\displaystyle{ \small{\times 10^{9}} }[/math] | |
Extinction | 1[math]\displaystyle{ \small{\times 10^{-11}} }[/math] | |
Beam power | 100 | kW |
Optimizable parameters for stopping target material | ||
Aluminum stopping target | ||
Number of bunches | 16 | (at 162.5 MHz) |
Spill width | 100 | ns |
Spill period | 1693 | ns |
Spills/linac rep | 27770 | approximate, at 20 Hz linac repetition rate |
Protons/spill | 1.4[math]\displaystyle{ \small{\times 10^{9}} }[/math] | |
POT | 4.67[math]\displaystyle{ \small{\times 10^{22}} }[/math] | |
Stopped mu/p | 1.9[math]\displaystyle{ \small{\times 10^{-4}} }[/math] | rough estimate, TBC, assumes stopped mu/kW same at 800 and 8000 MeV among possibly other things |
SES | <3[math]\displaystyle{ \small{\times 10^{-18}} }[/math] | |
E(conversion e-) | 104.97 | MeV |
tau(muon) | 864 | ns |
Lead stopping target | ||
E(conversion e-) | 94.9 | MeV |